Commercial construction across South Central Wisconsin

Featured Case Study

The River Food Pantry Community Center

Mazomanie, Wisconsin

On Schedule

Completed with no lost-time incidents

$8,659,090.60

Final Cost

Nov. 22, 2024

Construction Started

Nov. 17, 2025

Project Completed

Project Overview

A New Community Center Built to Serve The River’s Mission

New community center and food pantry facility for The River Food Pantry, including a dining room, commercial kitchen and prep areas, food processing space, e-pantry, clothing room, enclosed drive-thru pantry, offices, volunteer and staff support areas, mezzanine workspace, storage, patio, site improvements, utilities, and related building systems. The facility was designed to support The River’s mission while improving food distribution, community access, and operational efficiency.

Project Details

Location
3301 Packers Avenue, Madison, Wisconsin
Client
The River Food Pantry
Role
Construction Manager / General Contractor
Schedule
Started November 22, 2024; completed November 17, 2025

Final Cost

$8,659,090.60

Result

Completed per schedule
Community center exterior
Project Leadership
ABC’s Role
Advanced Building Corporation served as Construction Manager and General Contractor. ABC was responsible for overall project coordination, budgeting, procurement, subcontractor management, schedule control, construction execution, and coordination with the owner, design team, utility providers, and specialty trade partners.
Project Requirements

Unique Challenges

The project combined public-facing community space with back-of-house food pantry operations, requiring careful coordination of food service areas, e-pantry operations, commercial kitchen equipment, storage, drive-thru circulation, utility upgrades, solar infrastructure, geothermal systems, and owner equipment relocation. The project was also delayed nearly nine months while awaiting City of Madison approvals, requiring ABC to maintain momentum and re-sequence work once construction was released.

Phasing / Occupied Conditions

This was a new-site project, but turnover required coordination of existing owner equipment and operational items from The River’s prior location. ABC coordinated the move-over of existing equipment and closely managed final turnover activities so the facility could open on time.

 

Construction Process

Municipal Coordination

ABC coordinated through a lengthy City of Madison approval period before mobilization. Once approvals were received, ABC worked with the owner, design team, inspectors, and utility providers to maintain compliance, resolve field coordination items, and keep the project moving toward the required completion date.

Structural steel framework during construction of River Food Pantry Community Center
On-Time Delivery

Scheduling Complexity

ABC started construction on November 22, 2024 following the extended approval delay and completed the project on November 17, 2025. The team managed winter conditions, utility upgrades, food service equipment coordination, solar and geothermal coordination, and move-in activities while still completing the project on schedule.
Interior staircase and hallway at River Food Pantry Community Center

Project Photography

Community Spaces & Food Pantry Operations

hallway at River Food Pantry Community Center
Employee lounge and collaboration space
stainless steel sinks at River Food Pantry
Food Pantry Interior
Large community space with exposed ceiling structure and high windows
Integrated manufacturing Community Space
River Food Pantry building exterior with signage and snow-covered landscaping

Long-Term Performance

Sustainability Features

The project included solar coordination, geothermal / heat pump systems, upgraded utilities, energy-efficient building systems, insulated metal wall and roof assemblies, water-saving plumbing fixtures, LED lighting, and durable low-maintenance finishes suited for high-use food pantry and community center operations.

Energy Systems

Solar coordination and geothermal / heat pump systems.

Efficient Operations

LED lighting and water-saving plumbing fixtures.

Building Envelope

High-performance office HVAC zoning and radiant floor heat at the perimeter.

Durable Finishes

Low-maintenance finishes for high-use operations.
Budget Management

Cost Control / Value Engineering Examples

The project was originally established under a GMP approach, with the final cost of $8,659,090.60 reflecting owner-directed changes during the project. ABC helped control cost by coordinating scope early, managing owner-driven changes transparently, sequencing long-lead and specialty systems, and maintaining budget discipline while still incorporating added owner requests.
Steel roof beams and columns during construction of River Food Pantry

Site Safety

Safety Performance

ABC completed the project with no safety issues on site, including no lost-time incidents, while managing a complex construction site with heavy trade activity, winter conditions, utility work, and final equipment relocation.

Project Outcome

Outcome / Success Story

ABC delivered a highly visible nonprofit community project on schedule despite a lengthy preconstruction approval delay, winter construction, major utility coordination, and owner-directed changes. The River Food Pantry was very pleased with ABC’s performance. Rhonda Adams loved working with ABC and provided letters of recommendation for both ABC and Frank Gauger personally, including a recommendation on Frank’s LinkedIn account.

On Schedule

Completed November 17, 2025

$8.66M

Final Project Cost

0

Lost-Time Incidents

Strong

Owner Relationships

Overall, the project demonstrates ABC’s ability to manage complex community-focused facilities with public-facing operations, food service infrastructure, sustainable systems, tight turnover requirements, and strong owner relationships.

The River Food Pantry Community Center

Built to Support the Community.

Construction Manager / General Contractor · Advanced Building Corporation