Commercial construction across South Central Wisconsin

Featured Case Study

St. Vincent de Paul Baldwin-Williamson Addition & Renovation

Madison, Wisconsin 

Result

No safety issues

Design-Builder / General Contractor

Role

$7,906,981.94

Final Cost

4/17/2023 to 7/30/2024

Construction
Scope summary

Expanding a community-focused facility

Design-build renovation and addition for St. Vincent de Paul at the Baldwin-Williamson location in Madison, Wisconsin. The project included an 18,240 SF building addition with new basement, first floor, and second floor areas, plus Level 2 alterations to the existing retail store. The completed work supported a total project area of approximately 33,423 SF, including existing retail space to remain, new retail and support areas, office and flex space, storage, loading dock improvements, elevator and stair systems, sitework, utilities, exterior improvements, and upgraded building systems. Final project cost was $7,906,981.94.

Project Details

Location
Madison, Wisconsin
Client
St. Vincent de Paul Baldwin-Williamson
Role
Design-Builder / General Contractor
Construction
4/17/2023 to 7/30/2024

Final Cost

$7,906,981.94

DUCT WORK

Project Leadership
Integrated leadership from design to turnover
ABC served as the Design-Builder and General Contractor. ABC hired and managed the architect, all engineers, design-build MEP contractors, and major trade contractors. ABC was responsible for design coordination, permitting support, budget control, procurement, subcontractor management, schedule management, site logistics, City of Madison coordination, owner communication, and turnover.
Unique challenges

Delivering a complex urban renovation

The project combined a major addition with renovation work inside the existing St. Vincent de Paul retail store. Major challenges included deep pile foundations and stabilization work, a constrained urban site at Williamson Street and South Baldwin Street, City of Madison plan approval requirements, road and lane closures, right-of-way impacts, public pedestrian and traffic coordination, and the rerouting of power serving downtown Madison underground because the existing utility alignment was too close to the new building footprint.

Phasing / occupied conditions

ABC managed construction adjacent to and within the existing store environment while adding new building area. The work required careful phasing of demolition, foundations, superstructure, masonry, building enclosure, MEP rough-ins, existing building renovations, final cleaning, punch list, and turnover. Temporary egress, barricades, fencing, access control, and site logistics were coordinated so the renovation and addition could progress safely around existing building conditions.
Municipal coordination

Coordinating work across the city

ABC coordinated extensively with the City of Madison for plan approvals, right-of-way work, road and lane closures, sidewalk and curb impacts, utility work, forestry requirements, permits, and public improvements. Work along South Baldwin Street and Williamson Street required detailed coordination for barriers, roadway demolition, temporary lane impacts, utility relocations, MG&E coordination, City Engineering requirements, City Forestry requirements, and inspections.

Glass-enclosed room beside the St. Vincent de Paul retail area
Scheduling complexity

Managing a complex construction sequence

ABC started construction on November 22, 2024 following the extended approval delay and completed the project on November 17, 2025. The team managed winter conditions, utility upgrades, food service equipment coordination, solar and geothermal coordination, and move-in activities while still completing the project on schedule.
Exposed ceiling insulation, ductwork, and lighting inside the renovated facility

Project Photography

Expanded Retail & Support Spaces

Renovated retail and support area with counters, shelving, and workstations
Expanded Retail & Furniture Display Area
Interior staircase surrounded by a colorful community mural
Community Gathering at St. Vincent de Paul
Seating area with green chairs beside large windows
Renovated Lounge & Meeting Space
Glass-fronted commercial building illuminated at dusk
Sustainability features

Reusing and improving an urban building

Existing building reuse

The project reused and improved an existing urban retail building while adding needed new space in a developed Madison neighborhood.

Sustainability-related features

Sustainability-related features included solar coordination and installation, reduced impervious coverage compared with existing conditions, erosion control measures, stormwater and utility improvements, bird-safe glazing requirements, durable interior finishes, and upgraded building systems.
Cost control / value engineering examples

Creating value through integrated delivery

ABC’s early design-build involvement allowed the team to coordinate constructability, budget, design scope, and phasing before and during construction. ABC managed owner-directed changes while maintaining project control and continuity. Value was created through integrated design-builder coordination, direct management of the architect and engineering team, full design-build MEP coordination, proactive municipal coordination, and detailed sequencing of the existing building renovation and new addition.

Aerial view of a metal building facility and surrounding grounds
Safety performance

No safety issues

ABC completed the project with no safety issues while managing a constrained urban site, deep foundation work, right-of-way activity, lane closures, utility relocations, renovation work, and a complex multi-trade construction schedule.
Outcome / success story

A successful community-focused outcome

ABC successfully delivered a complex urban renovation and addition for St. Vincent de Paul that expanded and improved the Baldwin-Williamson facility. The project demonstrates ABC’s ability to lead design-build delivery, manage difficult urban logistics, coordinate major utility impacts, work through municipal approvals and road closures, and deliver a mission-driven community facility with no safety issues.

No safety issues

Result

$7,906,981.94

Final Cost
 

Design-Builder / General Contractor

Role

4/17/2023 to 7/30/2024

Construction

Overall, the project highlights ABC's ability to manage a high-profile nonprofit project with design-build responsibility, complex municipal coordination, major utility impacts, occupied renovation conditions, and a successful community-focused outcome.

The River Food Pantry Community Center

Built to Support the Community.

Construction Manager / General Contractor · Advanced Building Corporation