Commercial construction across South Central Wisconsin
Madison, Wisconsin
Design-build renovation and addition for St. Vincent de Paul at the Baldwin-Williamson location in Madison, Wisconsin. The project included an 18,240 SF building addition with new basement, first floor, and second floor areas, plus Level 2 alterations to the existing retail store. The completed work supported a total project area of approximately 33,423 SF, including existing retail space to remain, new retail and support areas, office and flex space, storage, loading dock improvements, elevator and stair systems, sitework, utilities, exterior improvements, and upgraded building systems. Final project cost was $7,906,981.94.
Final Cost
DUCT WORK
The project combined a major addition with renovation work inside the existing St. Vincent de Paul retail store. Major challenges included deep pile foundations and stabilization work, a constrained urban site at Williamson Street and South Baldwin Street, City of Madison plan approval requirements, road and lane closures, right-of-way impacts, public pedestrian and traffic coordination, and the rerouting of power serving downtown Madison underground because the existing utility alignment was too close to the new building footprint.
ABC coordinated extensively with the City of Madison for plan approvals, right-of-way work, road and lane closures, sidewalk and curb impacts, utility work, forestry requirements, permits, and public improvements. Work along South Baldwin Street and Williamson Street required detailed coordination for barriers, roadway demolition, temporary lane impacts, utility relocations, MG&E coordination, City Engineering requirements, City Forestry requirements, and inspections.
ABC’s early design-build involvement allowed the team to coordinate constructability, budget, design scope, and phasing before and during construction. ABC managed owner-directed changes while maintaining project control and continuity. Value was created through integrated design-builder coordination, direct management of the architect and engineering team, full design-build MEP coordination, proactive municipal coordination, and detailed sequencing of the existing building renovation and new addition.
ABC successfully delivered a complex urban renovation and addition for St. Vincent de Paul that expanded and improved the Baldwin-Williamson facility. The project demonstrates ABC’s ability to lead design-build delivery, manage difficult urban logistics, coordinate major utility impacts, work through municipal approvals and road closures, and deliver a mission-driven community facility with no safety issues.
Result
Role
Overall, the project highlights ABC's ability to manage a high-profile nonprofit project with design-build responsibility, complex municipal coordination, major utility impacts, occupied renovation conditions, and a successful community-focused outcome.