Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies

Advanced Building Corporation Awarded Chamberlin Remodel for Kolkowitz Lab

Advanced Building Corporation has been named the general contractor for Chamberlin Hall 5th Floor Remodel- Kolkowitz Lab. This project takes existing student office space and converts it into two laboratories for a new faculty member. The labs will implement a dedicated air handler as the two new labs will have strict temperature and relative humidity controls.

The project is projected to be completed Fall of 2018.

Picture courtesy of UNIVERSITY of WISCONSIN–MADISON